2005 Completed Construction Projects

Mores Subdivision - Watermain Replacement

Explanation of Project
The City will be replacing the existing watermains that are nearing the end of their life span. Completion of this project will improve water supply and reliability of the system, and reduce maintenance costs.

Location

  • Fairfax Crescent
  • Fairfax Place
  • Seafair Drive from Fairway Road to Francis Road

Scope of Work

  • Construction of new watermain, including renewal of water connections, fire hydrants and installation of water meters.
  • Excavation and restoration of road and boulevard surfaces as required.

General Considerations

  • Typical hours of work will be from 7:00 am to 5:00 pm, Monday to Friday.
  • Vehicle and pedestrian traffic may be limited at times.  Please use an alternate route, if possible.
  • If there is vegetation on City property you wish to retain in the immediate construction area, please remove it prior to project commencement.
  • Residents will be notified in advance of any scheduled water shutdowns.
  • It will be necessary to excavate some driveway crossings.  Crews will make every effort to notify you on the day prior to the work and again in the morning.  At the end of each day, driveways that have been disturbed will be restored to a gravel condition.

Estimated Construction Period and Cost

August - November 2005        $708,050

Questions? Email Mike Maxwell or call 604-276-4054

Westminster Highway  - Undergrounding/Beautification Hydro, Telus and Shaw

Explanation of Project

As part of the City Centre Beautification Program, the City will construct underground ducting and related kiosks and manholes to transfer all existing overhead wiring to underground.  The City has an agreement with BC Hydro to share the costs of their new facilities.

Location

  • Westminster Highway from No. 3 Road to Garden City Road.

Scope of Work

  • Construct ducts, manholes, service boxes, and kiosks for BC Hydro, Telus and Shaw Cable.
  • Reconnect private services.
  • Install City Centre street trees.

General Considerations

  • Typical hours of work will be from 7:00 am to 5:00 pm, Monday to Friday.
  • Vehicle and pedestrian traffic will be impacted at times.
  • Residents and businesses will be contacted by BC Hydro in advance of any power interruptions.  Telus and Shaw do not expect interruptions but will also contact in advance if necessary.
  • Driveways will be impacted during construction.  Restoration of driveway access will be as quickly as possible with a minimum of restoration of access by the end of each day.

Estimated Construction Period and Cost

April - October 2005        $1,786,000 (including 1/3 cost sharing on BC Hydro facilities)

Questions? Email Carlos Rocha or call 604-276-4025 