Transportation Projects
The City of Richmond's Transportation Department generally undertakes several cycling and pedestrian facility, traffic calming and traffic signal projects each year. A list of specific projects is below. Please also refer to Construction Projects for a complete listing of construction projects.
Arterial Road and Crosswalk Improvement Programs
Explanation of Project
Special Crosswalks: Upgrade of existing crosswalks to add overhead illuminated signs with downward lighting and pedestrian pushbutton-activated flashing amber lights.
Arterial Roadway Improvements: Upgrade of existing intersections to improve road safety for motorists, pedestrians and cyclists.
Locations: Special Crosswalks
- Shell Road Trail & Blundell Road
Locations: Arterial Roadway Improvements
- Garden City Road & Westminster Highway
- Granville Avenue & Cooney Road
- Cambie Road & St. Edward's Drive
Locations: Top 20 Collision-Prone Intersections
- Cambie Road & No. 4 Road
- Westminster Highway & No. 2 Road
Scope of Work
- Special Crosswalk: Installation of overhead lights and flashers and side-mounted beacons and push buttons.
- Garden City Road & Westminster Highway: asphalt walkway with barrier along east and south sides fronting 9120 Westminster Highway
- Granville Avenue & Cooney Road: removal of channelized right-turn island at northwest corner
- Cambie Road & St. Edward's Drive: removal of channelized right-turn island at northeast corner
- Cambie Road & No. 4 Road: new left-turn lanes on all four legs
- Westminster Highway & No. 2 Road: removal of channelized right-turn island at northwest corner, enlarge pedestrian refuge areas, modification of intersection geometry and traffic signal
General Considerations
- Typical hours of work will be from 7:00 am to 5:00 pm, Monday to Friday.
- Vehicle and pedestrian traffic may be limited at times.
Estimated Construction Period and Cost
- Special Crosswalks 2021 $360,000
- Removal of Right-Turn Islands 2021-2022 $530,000
- Garden City Road & Westminster Hwy 2021 $200,000
- Cambie Road & No. 4 Road 2021-2022 $1,700,000
- Westminster Highway & No. 2 Road 2021-2022 $1,300,000
Transit-Related Amenity and Roadway Improvement Programs
Explanation of Project
Upgrade of existing bus stops to become accessible for mobility-impaired users; provision of shelters and benches at bus stops; and provision of pedestrian connections to and from bus stops.
Scope of Work
- Installation of bus stop landing pads and railings.
- Installation of shelter and benches at bus stops.
- Construction of concrete sidewalks or asphalt walkways to connect to and from bus stops.
- Upgrade of crosswalks connecting to bus stops.
Locations
- Bridgeport Road & Smith Street: landing pad
- No. 2 Road & Francis Road: landing pad
- Westminster Hwy & No. 8 Road: landing pad
- No. 6 Road & Cambie Road: landing pad
- Westminster Hwy & Elmbridge Way: landing pad
- Jacombs Road & Cambie Road: landing pad
- Railway Ave & Lancing Road: landing pad
- Railway Ave & Hollymount Drive: landing pad
- Chatham Street & Fifth Avenue: landing pad
- Machrina Way & No. 5 Road: landing pad
- Hammersmith Way & Hammersmith Gate: landing pad
- Gilbert Road & Lucas Road: landing pad
- No. 1 Road & Broadway Stree: landing pad
- No. 1 Road & Williams Road: landing pad
- No. 4 Road & Odlin Road: landing pad
- No. 4 Road & Fisher Drive: landing pad
- Jack Bell Drive & Jacombs Road: landing pad
- Commerce Parkway & International Place: landing pad
- Commerce Parkway & No. 6 Road: landing pad
- Bridgeport Road & Olafsen 2 Road: landing pad
General Considerations
- Typical hours of work will be from 7:00 am to 5:00 pm, Monday to Friday.
- Vehicle and pedestrian traffic will be impacted at times.
Estimated Construction Period and Cost
- 2021 $177,500 (landing pads)
Traffic Signal Program
Explanation of Project
Various intersection improvements to improve traffic safety.
Scope of Work
- Installation of new traffic signals
- Installation of video detection cameras
- Installation of overhead LED street name signs
- Installation of accessible pedestrian signal features
- Minor intersection improvements
Locations: Traffic Signals
- No. 6 Road & Vulcan Way: new full traffic signal with railway crossing gates
General Considerations
- Typical hours of work will be from 7:00 am to 5:00 pm, Monday to Friday.
- Vehicle and pedestrian traffic will be impacted at times.
Estimated Construction Period and Cost
- Traffic Signals 2021 $800,000
- Traffic Video Cameras 2021 $170,000
- LED Street Name Signs 2021 $300,000
Neighbourhood Traffic Safety and Walkway Programs
Explanation of Project
Construction of pedestrian walkways and installation of traffic calming measures on local roads within neighbourhoods.
Scope of Work
- Installation of traffic calming measures
- Shoulder widening and paving of pathways
Locations
- St. Edwards Drive (350m west of Cambie Road-Bird Road): new walkway on north side
- Westminster Hwy (Muir Road-150m east): new walkway on north side
- River Road (No. 6 Road-Burdette Road): new walkway on northside
- Traffic Calming Measures: locations to be determined
General Considerations
- Typical hours of work will be from 7:00 am to 5:00 pm, Monday to Friday.
- Vehicle and pedestrian traffic will be impacted at times.
Estimated Construction Period and Cost
St. Edward's Drive Walkway 2021 $420,000
Westminster Hwy Walkway 2021 $190,000
River Road Walkway 2021 $350,000
Traffic Calming Measures 2021 $300,000
Active Transportation Program
Explanation of Project
Construction of cycling and rolling facilities to provide safe and convenient access to major destinations and improve the cycling and rolling environment and safety.
Locations
- No. 2 Road: Steveston Highway-Williams Road
- Lansdowne Road: Gilbert Road-Pearson Way
- Browngate Road: Hazelbridge Way-No. 3 Road
- Shell Road: Alderbridge Way-Highway 99 Overpass
Scope of Work
- No. 2 Road: new off-street multi-use pathway on east side
- Lansdowne Road: new off-street multi-use pathway on north side
- Browngate Road: protected on-street cycle tracks on south side
- Shell Road: reconstruction of existing off-street multi-use pathway on east side
General Considerations
- Typical hours of work will be from 7:00 am to 5:00 pm, Monday to Friday.
- Vehicle and pedestrian traffic will be impacted at times.
Estimated Construction Period and Cost
No. 2 Road 2022 $2,400,000
Lansdowne Road 2022 $300,000
Browngate Road 2022 $400,000
Shell Road 2022 $590,000
Staff contact during the development stage:
Supervisor, Traffic Signals Systems
transportation@richmond.ca 604-276-4298
Staff contact during the construction stage:
Manager, Engineering Design & Construction
EngineeringRequest@richmond.ca 604-276-4377