Garden City Lands Archive
This archive of updates and documents provides detailed reference material related to the City Council approved development of the Garden City Lands Legacy Landscape.
The Park Development Plan
Park Development Plan includes:
- The Agricultural Lands: A total of 16 ha (40 acres) are dedicated to farming and it is proposed that Kwantlen Polytechnic University will farm in the northern section while the City will manage the southern 8 ha (20 acres). The rainwater storage ponds that are illustrated at the northwest and southwest of the site are sized to retain sufficient rainwater to provide supplemental water for irrigation purposes, thereby reducing reliance on potable water. The majority of the farming zone will be open to the public via accessible trails that can also serve as farm service roads.
- The Bog: This ecologically important area remains the dominant feature of the Lands. The health of the bog will be enhanced by the construction of a seepage barrier that will hold rain water within the bog while allowing the development of agricultural uses on the west side of the park. In addition, a long term management plan to monitor water levels and control invasive plant species will further aid in protecting the bog ecosystem. The Fen noted on the plan is an ecologically important associate of a bog ecosystem and is therefore important to maintain.
- The Rise: This area will be developed for recreational purposes and will include a demonstration orchard as well as a native forest. The orchard plantings will demonstrate different orchard planting and management techniques as part of a community education and outreach program.
- The Nodes: At each of the park entry points there will be arrival areas with interpretive and wayfinding features so that visitors can orient themselves to the trail system and to the park features.
- The Dyke: The primary function of the dyke is to act as a seepage barrier to separate the ground water requirements of the bog and the agricultural lands. The dyke will also be constructed to provide access for farm and maintenance vehicles as well as pedestrians and cyclists.
- Perimeter Trails: There will be separate pedestrian and bicycle trails with native plantings used to buffer the park from the busy streets. The decision to provide separated trails was based on public feedback and that the surrounding neighbourhoods are growing rapidly. Even though separated trails occupy more land, the footprint of these trails will largely remain in areas previously disturbed by the adjacent road construction and therefore have minimal impact on the bog ecosystem.
- July 18, 2016: Garden City Lands Park Development Plan
- Described the results of the Water and Ecological Resource Management Strategy (WERMS), the public consultation process and the subsequent refinement of the Legacy Landscape Plan.
- Described Phase 1 implementation as per the previously approved Capital submissions.
- Attached the draft WERMS document that provided confirmation of the location and function of the central berm, options for the seepage barrier and recommendations for drainage in the agricultural area.
- Attached the updated Park Development Plan with descriptions, cross-sections and plan views of Phase 1 Elements.
- January 26, 2016: PRCS Committee determines that the Garden City Lands Update will be a standing agenda item. Updates have been provided at each Committee meeting.
- May 26, 2015: Garden City Lands 2015 Update
- May 27, 2014: Garden City Lands Legacy Landscape Plan
- Oct 29, 2013: Garden City Lands – Phase Two Concept Plan Options
- July 18, 2013: Garden City Lands – Phase One Vision and Guiding Principles
- Oct 15, 2012: Garden City Lands – Planning Process 2013-2014
The Legacy Landscape Plan
The Legacy Landscape Plan was approved by Richmond City Council in June 2014.
Key components and highlights of the plan include:
- Dedicating up to 50 acres of the site for urban agriculture and farming uses.
- Preserving about 70 acres of the site in its ecologically-significant and natural bog state with boardwalks and lookouts sensitively integrated throughout to support environmental interpretation and public enjoyment of this area.
- An extensive trails system featuring a 2.5-kilometre perimeter trail.
- A community hub acting as a focal point for public activities and principal gateway into the park. The hub will be comprised of gathering and festival spaces, play elements, community and demonstration gardens and a small cluster of service buildings.
- An eight-acre “mound” on existing raised area at the north end of the site, which will be used for various neighbourhood and community uses with seating and picnicking, pathways, open grass meadow areas and fruit and woodlot trees.
- A sanctuary area in the centre of park providing quiet space for reflection and other passive activities.
- A designated wetland, which will act as a natural collector of surface water draining through the site, and a water feature for public enjoyment.
- Public art and other cultural landscape features will be integrated throughout the park.
- To view the entire Legacy Landscape Plan document, see the following:
2014 Legacy Landscape Plan - June 2014
The document has also be broken down into individual sections for easier viewing online.
- 2014 GCL Legacy Landscape Plan - Intro Section 1
- 2014 GCL Legacy Landscape Plan - Section 2
- 2014 GCL Legacy Landscape Plan - Section 3
- 2014 GCL Legacy Landscape Plan - Section 4
- 2014 GCL Legacy Landscape Plan - Section 4B
- 2014 GCL Legacy Landscape Plan - Section 5
- 2014 GCL Legacy Landscape Plan - Appendices
Create Garden City Lands Ideas Fair
The Legacy Landscape Plan was developed through an intensive 18-month public process in which thousands of Richmond residents had input on developing the vision for the future of the Garden City Lands.
The Create Garden City Lands ideas Fair on June 1, 2013 was a huge success with more than 650 participants. The following is a sampling of some of the public input received at the event.
Biophysical Inventory and Analysis
To fully understand the diversity of the Garden City Lands, and make informed decisions about the site’s future, the City commissioned a Biophysical Inventory and Analysis. The work was undertaken by a professional consulting team with expertise in ecology, wildlife, habitat assessment, hydrology and agrology. Inventory and assessment information contained in this report will provide a foundation of knowledge for the City of Richmond, other consultants and the general public as this planning process moves forward.
The Biophysical Inventory and Analysis provides a snapshot of the Garden City Lands during the period in which it was completed. Truly understanding the site will require observation over many years. Balancing healthy ecological functions and creating interesting and enjoyable human experiences in Garden City Lands will be an important consideration when creating a legacy open space for future generations. The City will continue to conduct ongoing analysis and inventory of the lands to further inform the planning process.
GCL Biophysical Inventory - July 2013